Redundant power distribution
N+1 and 2N circuit design so a single breaker, panel, or feed failure doesn't take down a rack row or the whole room.

Data Center Electrical
Redundant power distribution, UPS integration, and generator tie-ins for data centers, colocation space, and enterprise server rooms across the Twin Cities — designed and installed to keep critical loads running through a utility outage, not just survive an inspection.
Start a Conversation →N+1 and 2N circuit design so a single breaker, panel, or feed failure doesn't take down a rack row or the whole room.
Electrical tie-ins for rack-mount and standalone UPS systems, sized and wired to actually carry your critical load through a transfer, not just ride out a blip.
ATS installation and wiring so backup generator power picks up automatically, with proper isolation from utility power during transfer.
Dedicated circuits, whips, and PDU installation sized for modern server and switch density, not retrofitted office-building capacity.
Work performed to NEC Article 645 (information technology equipment) requirements, with permitting, inspection, and arc-flash labeling handled as part of the project.
Dedicated circuits for CRAC/CRAH units and in-row cooling, coordinated so mechanical and electrical loads are planned together, not as an afterthought.